George Graham

Wesson

Summary

Dynamic construction professional with extensive experience at Pike Electric, excelling in project coordination and contractor oversight. Proven track record in implementing safety protocols and enhancing operational efficiency. Skilled in blueprint interpretation and fostering community relations, driving continuous improvement while maintaining high-quality standards. Committed to strategic planning and resource coordination for successful project outcomes.

Overview

2026
2026
years of professional experience

Work History

Superintendent

Pike Electric
07.2019 - Current
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Maintained safety onsite and upheld all OSHA regulations by [Action].
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Developed and maintained productive working relationships with internal and external stakeholders.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Analyzed reports to identify areas of improvement and implement corrective action.
  • Stepped up during foreman's absence to answer questions and delegate project tasks to employees.

Foreman

Power Secure
11.2017 - 07.2019
  • Checked equipment to determine if maintenance was required.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Created and implemented plans to maximize efficiency of workers.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Provided feedback to workers on job performance and safety procedures.
  • Administered disciplinary actions to workers violating safety regulations and company policies.

Journeyman Lineman

GSW
2016 - 2017
  • Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
  • Accessed specific service areas to string lines and install terminal boxes, auxiliary equipment, or metering appliances.
  • Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
  • Worked on transmission lines.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Followed all safety protocols and regulations while working.
  • Proved successful working within tight deadlines and a fast-paced environment.

Lineman/Machine Operator

Irby Construction
05.1998 - 2012
  • Removed old poles and hardware and replaced with new equipment.
  • Observed company safety rules and regulations to minimize workplace accidents.
  • Worked on transmission lines.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
  • Complied with company and OSHA safety rules and regulations.
  • Set up and ran machinery to produce exceptional products for industrial needs.

Education

GED -

Excel High School
Edina, MN

Skills

  • Program implementation
  • Fiscal planning
  • Employee discipline
  • Contractor oversight
  • Construction supervision
  • Resource coordination
  • Continuous improvement
  • Community relations
  • Blueprint and schematics
  • Performance improvements
  • Training oversight
  • Scheduling coordination
  • Strategic planning
  • Environmental awareness
  • Blueprint interpretation

Accomplishments

Completed Leadership school August 22, 2025.

Barehand certified June of 2016.

First aid 2023

Cpr 2023

Forklift certification 2023

Timeline

Superintendent

Pike Electric
07.2019 - Current

Foreman

Power Secure
11.2017 - 07.2019

Lineman/Machine Operator

Irby Construction
05.1998 - 2012

Journeyman Lineman

GSW
2016 - 2017