Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic

Jason Caspolich

Bay St Louis,MS

Summary

Hardworking, resourceful, detail-oriented, organized, determined and dependable I&E Project Manger with twenty seven (27) years of experience throughout the Industrial, Commercial and Marine industries. Efficient in planning, scheduling, directing, tracking, monitoring and maintaining continuous operations in various departments on short-and long-term projects. Ability to handle multiple projects simultaneously with a high degree of accuracy and success by applying creative and analytical approaches to operations, safety, quality and production for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Project Manager Team Leader

ISC Constructors
05.2020 - Current
  • Project type: Small capital projects at Chevron, Pascagoula Mississippi.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Oversee installations of temporary power for major shutdowns, turnarounds and outages. Setting up generators, locomotive cables, transformers, power panels, grounding, lighting, terminations, testing and maintenance.
  • Oversee the procurement and installation of numerous I&E devices and equipment such as but not limited too: Emergency shut down junction boxes, SIS devices, SIF devices, transmitters, cable tray, grounding, channel tray, tubing, cable pulling, testing, terminating, commissioning, sell off and start up.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Identified plans and resources required to meet project goals and objectives.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Developed and implemented strategic project plans to meet business objectives.
  • Managed projects from procurement to commission.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Tracked project and team member performance closely to quickly intervene in mistakes or delays.
  • Developed and implemented project plans and budgets to ensure successful execution.
  • Analyzed project performance data to identify areas of improvement.
  • Recruited and oversaw personnel to achieve performance and quality targets.
  • Sourced, vetted and managed vendors needed to accomplish project goals.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.

Project Manager Team Leader/Construction Planner

Excel Contractors
02.2017 - 05.2020
  • Project type: New Linde Nitrogen/Hydrogen plant
  • Planned, created and submitted IWP work packages for modules, skids, scope items & vendor supplied equipment.
  • Conducted daily field walks with I&E, Civil, Structural & Mechanical's supervision, safety, quality departments as well as sub-contractors to ensure coordination efforts between crafts and crews were efficient.
  • Tracked IWP progress and reporting.
  • Third party coordinator for the Heat Tracing sub-contractor.
  • Third party coordinator over the Cathodic Protection sub-contractor.
  • Track and report weekly manpower, material and equipment budgets for both sub-contractors.
  • Create and submit RFI's to engineering.
  • Project type: Installation of two new 1200 ton chillers at Syngenta in Geismar, LA
  • Fabrication and installation of conduit, cable tray, grounding, channel tray, tubing tray, instruments, hand stations, junction boxes, DCS cabinets, removing and replacing 600v buckets, modifying switchgear to accommodate new buckets, testing, terminating power, control, fiber, communications and instrumentation cables
  • Project type: Rewire existing SMAG ship loader for Kinder Morgan in Houston, Texas.
  • Planned, designed, and scheduled phases for large projects.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Developed and initiated projects, managed costs, and monitored performance.

Project Manager Team Leader/IWP Planner

MMR Constructors
03.2015 - 01.2017
  • Project Locations and types: Juniper facility in Lake Charles, La. Converting an LNG plant to manufacture an oil ingredient for women’s makeup.
  • Sasol Refinery in Lake Charles, LA. New construction.
  • New construction of a new Coker unit at their facility
  • New construction of a Cryo plant for Exxon Mobil near Hobbs, NM.
  • Phillips 66 refinery in Sweeny, TX. Expansion of a tank farm, four new MCC sub stations, pipeline tie ins and new pumping stations for the C5+ pipeline expansion to Pasadena, TX.


  • Planned, designed, and scheduled phases for large projects.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Provided detailed project status updates to clients and executive management.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Managed projects from procurement to commission.
  • Reported regularly to managers on project budget, progress and technical problems.
  • Recruited and oversaw personnel to achieve performance and quality targets.
  • Sourced, vetted and managed vendors needed to accomplish project goals.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.

Superintendent

ISC Constructors
08.2012 - 02.2015
  • Project type & locations: small capital projects including but not limited too, Analyzer upgrades on all of the refinery and chemical unit flares according to the new policies put forth by the federal government, O.S.H.A and the E.P.A.
  • Estimate, Plan, schedule and execute installations of cable tray, conduit, channel tray, snaptrack tray, (FT, PT, LT, TT) transmitters, valves, M.O.V's, junction boxes, equipment grounding, transformers, tubing, panels, switchgear, PLC's, DCS systems, temp power etc.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Directed projects according to schedule and quality demands.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Developed and maintained positive relationships with clients, and other contractors.
  • Investigated and reported on accidents, injuries and near-miss incidents.

Planner/Lead Field Supervisor

Triad Electric & Controls
05.2009 - 03.2011
  • Project type: Upgrading the PLC’s, DCS systems as well as the field instrumentation
  • Location :(Dow Chemical in
  • Plaquemine LA.) Project type: New construction of the Poly B unit
  • Location: (Port Arthur TX)
  • New unit construction of the KNHT and GHT units at the Total facility
  • Location: (Kemper County
  • MS) Project type: new construction of a coal burning power plant
  • Duties include but not limited to: Scheduling, planning, estimating, RCI investigations, material tracking, procurement of manpower, tools and equipment
  • Supervised field operations teams to complete projects within established timelines.
  • Monitored employee performance for compliance with regulations and policies.
  • Presented weekly and monthly performance reports to demonstrate team progress.
  • Planned and scheduled field activities according to set timelines and order of operations.
  • Investigated issues and developed effective solutions.
  • Evaluated performance and progress, and made proactive adjustments.
  • Resolved customer complaints to maintain satisfaction and loyalty.
  • Developed and implemented effective strategies to maximize productivity and minimize costs.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected equipment and tools used for safe operation.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Created and implemented plans to maximize efficiency of workers.
  • Supported construction, safety and quality departments to facilitate successful completion of projects.

Electrical Supervisor

Gaylor Electric
06.2005 - 04.2009
  • New construction of the Thyssen Krupp steel mill.
  • Supervised and evaluated installation of lights, receptacles, fire alarm system, badge readers, conduit, cable tray, cable pulling, terminating, limit switches, PLC cabinets, ESD devices, grounding, testing, commissioning and sell off.
  • Monitored manufacturing operations of electrical devices for compliance with safety protocols.
  • Directed projects according to schedule and quality demands.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Created and implemented plans to maximize efficiency of workers.
  • Documented employee manhours, wages and other pertinent information.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.

Electrical Foreman

Tracer Industries
06.2003 - 08.2005
  • New construction on the largest expansion globally for the Shell/Motiva facility
  • A total of (8) new units were being constructed at the same time.
  • Oversee the installation of electrical devices, card readers, control stations, raceway, cable pulling, junction boxes, RTD’s , panels, field devices such as but not limited too, terminating, testing, etc.
  • Read and interpret blueprints, High voltage terminations, oversee installations such as but not limited to, transformers, panels, buckets, lighting, RTD’s, generators, vibration switches, motors, valves etc.
  • Supervised crew of electricians and maintained safe, efficient and structured work environment.
  • Provided technical guidance to employees on safe operation of equipment and tools.
  • Prioritized and distributed work assignments, selecting employees by strength in skills required for each task.
  • Read complex schematics and blueprints to install and repair electrical systems.
  • Planned, assigned, scheduled and supervised work of power linesmen, electricians and other assisting personnel.
  • Maintained detailed records of work activities and notable events.
  • Monitored employees to enforce safety and work performance standards.
  • Developed training methods for new electricians to align with company policies.
  • Oversaw control room modification work conducted by electricians, ensuring compliance with safety guidelines, scope of work and reporting requirements.
  • Resolved team and client challenges with proactive and actionable solutions.
  • Generated progress reports for clients and coordinated to make determinations on adjusted time and cost requirements.
  • Oversaw work of electrical and telecommunication personnel for key clients.
  • Oversaw installation, maintenance and repair of power lines, electrical systems, fixtures and appliances.

Education

High School Diploma -

Hancock High School
Kiln, MS
05.1996

Skills

  • Planning
  • Scheduling
  • Expense track
  • Microsoft Outlook
  • Sharepoint
  • Microsoft Excel
  • Primavera P6
  • BIM 360

Certification

  • TWIC card
  • O.S.H.A card
  • Security Passport
  • Rig Pass
  • H.U.E.T. Helicopter
  • Water Survival
  • Personnel swing basket transfer
  • CPR
  • First Aid,
  • SIS/SIF
  • NFPA 70E Certified.
  • NCCER Plus certified in Electrical
  • 3M trained for medium and high voltage stress cones and terminations.

Additional Information

Referred by John Ngyun


References

Jason Hamilton (General Foreman)

(228) 324-2256


Michael Hayes ( Project controls manager)

(225) 907-9751


Dean Lebeau (Corporate construction manager)

(225) 715-6845

Timeline

Project Manager Team Leader

ISC Constructors
05.2020 - Current

Project Manager Team Leader/Construction Planner

Excel Contractors
02.2017 - 05.2020

Project Manager Team Leader/IWP Planner

MMR Constructors
03.2015 - 01.2017

Superintendent

ISC Constructors
08.2012 - 02.2015

Planner/Lead Field Supervisor

Triad Electric & Controls
05.2009 - 03.2011

Electrical Supervisor

Gaylor Electric
06.2005 - 04.2009

Electrical Foreman

Tracer Industries
06.2003 - 08.2005

High School Diploma -

Hancock High School
Jason Caspolich